Identification of variables that impact project success in Brazilian companies.
Selection of an appropriate methodology is very important for the success of a project work. There are various types of methodologies for managing the different types of projects. Appropriately arranged and legitimately oversaw venture or projects is relied upon to diminish the distinctive dangers and difficulties looked by the association. Nonetheless, one important basic need of task administration is decision of an appropriate venture procedure with the assistance that the undertaking will be executed (Berssaneti & Carvalho, 2015). Approach can be characterized as an arrangement of techniques that re executed in a specific region to get the changes needed in a specific association or a task. It provides assistance in orderly, organized and hypothetical examination of the diverse procedures and the techniques related with an association. The decision of the venture administration technique shifts from association to association and the requirements or objective of various associations’ changes. The reason for this exposition is to recommend fitting undertaking administration approaches for three unique associations (Galván-Cruz, Mora, O’Connor, Acosta-Escalante & Alvarez, 2015). The objectives of every one of the association differ and in this way, it is basic to recommend a legitimate undertaking administration approach for every association as per the hierarchical needs. Besides, there are various advantages of utilizing an appropriate venture administration approach in dealing with the diverse tasks of an association. Utilization of task administration strategy impressively helps in basic leadership. The extent of the task stays in charge with the utilization of a specific venture procedure as it takes out the odds of extension sneak in the undertaking. The utilization of legitimate venture strategy guarantees opportune execution of an undertaking with a less odds of calendar dangers. In this paper, the venture administration strategy for every association is proposed in the wake of assessing the undertaking requirements and the objectives of the task.
Association A will be a producer of technical products. It now needs to create showcase in North and South America. For this, the association is expected to extend its assembling activities in Brazil. The point of the association is to establish deals and showcasing division at the begining and afterward establishment of a minimal effort and high innovation fabricating plant. The organization right now has 2100 employees and for this task, the employees will be on secondment for 6 months to 12 months who will give assistance in the establishment of the new activities of the association. One major imperative criteria for picking a venture technique for this association is a quick usage of the undertaking, while another important characteristics being the execution of the task in a minimal effort.
International development projects by non-governmental organizations:
The execution of a task administration procedure in this specific association is an administration level movement since it is the choice of the administration to grow the organization’s business in Northern and Southern region of America. Since the decision of undertaking administration technique shifts from venture to extend, it for the most part turns into the duty of the task director for settling on the right decision of venture procedure (Mir & Pinnington, 2014). Subsequently, the task administrator and now and again, the program supervisor ought to be associated with this action.
PMBOK is the chosen methodology for managing the projects of this organization. PMBOK is an American National Standards Institute standard that was created by venture administration foundation. This strategy or venture direct partitions the task into five stages for better usage of each undertaking. In this way, the task administration collection of information isolates an undertaking into 5 different stages, which are starting, arranging, executing, controlling and shutting of the venture. Moreover, since the undertaking is a technological innovation venture, it is basic to include modernized process. This undertaking administration strategy starting at now is proposed for this venture just (Martens & Carvalho, 2016). PMBOK is an American standard of undertaking administration and thereof it is normal that local people will have a thought of this standard that will make the procedure of venture execution less demanding (Vijayasarathy & Butler, 2016). The usage get ready for the undertaking is talked about beneath.
In the start period of the undertaking, the task prerequisites are accumulated for building up the assembling plant. The arrangement for establishment of offers and advertising division of the association is likewise arranged in this stage (Kerzner, 2015).
In the arranging stage, the task design is made that includes establishment of of an undertaking group, asset allotment and calendar estimation for the venture.
The execution period of the task predominantly manages the usage of the venture that is establishment of an ease producing plant.
The end stage incorporates fruitful conveyance of the venture in planned time and the assessed cost.
The upkeep stage incorporates standard assessment for dispensing with the odds of venture disappointment.
The undertaking will be actualized by the usage design. One of the huge favourable circumstances of utilizing the PMBOK in ventures is that the whole undertaking can be appropriately administered and in this way, there are next to no odds of task disappointment. Undertaking administration and usage of venture in a controlled situation is offered by PRINCE2 strategy too. Be that as it may, the cost of activities that are utilizing the PRINCE2 strategy is significantly higher as the distinctive periods of the venture are executed in a controlled situation. A standout amongst the most critical criteria for this task is usage of a minimal effort venture and along these lines, this procedure isn’t proposed for this undertaking (Dybå, Dingsøyr & Moe, 2014).
Impact on international development projects of non-governmental organizations.
While proposing PMBOK strategy for the undertaking, certain suppositions are made. It is accepted that the neighbourhood colleagues will have an unmistakable learning about the essential procedure of PMBOK. It is additionally accepted that every one of the necessities of the undertaking are accurately recognized in the start period of the task and in this manner there are no odds of progress in extent of the venture. This is basic in light of the fact that the PMBOK does not permit the adjustment in venture scope after the undertaking has begun its execution (Bakel et al., 2018). PMBOK ends up fruitful in the activities that have a low level of vulnerability. In this way, it is accepted that this specific venture has low level of vulnerability.
Be that as it may, there are sure issues related with the utilization of PMBOK in an undertaking. This is principally on the grounds that PMBOK is just a manual for venture administration. PMBOK gives certain principles that can be utilized to actualize a venture and in this way it may not have any significant bearing in each undertaking. The PMBOK is decided for this undertaking as the current workers of the association will give a help to the task, who has a legitimate information and experience of utilizing PMBOK control (Joslin & Müller, 2016). Since this strategy does not have any significant bearing to a wide range of ventures, it is prescribed that this procedure is connected for this specific undertaking of the association and not to every one of the activities of the association. Another issue related with the utilization of PMBOK in usage of a venture is that, no change demand can be acknowledged after start of the task. Keeping in mind the end goal to moderate this test, the necessities gathering is done toward the start of the venture and those prerequisites are legitimately drafted in a task design (Svejvig & Andersen, 2015).
There are various advantages of embracing this technique for venture usage. The utilization of PMBOK guarantees that the undertaking will be conveyed with the planned time. This is conceivable since an arrangement driven task execution approach is followed in the undertaking and since the venture won’t think about any difference in scope in the task, it is normal that the venture will be finished in the set spending plan of the task (Gollenia, 2016). In this manner, the decision of PMBOK for dealing with the activities of association A is legitimized.
Impact of project methodologies on project success in different project environments.
This association is for the most part chipping away at the tasks of European government. The organization is a little estimated association with 300 workers. The point of the association is to expand the foundation ventures embraced by the organization in Europe yet the organization chief of the association is worried about the way that with the expansion in the quantity of activities being attempted, the money related dangers related with the association will increment also. Along these lines, a legitimate venture strategy is to be recommended for the association that will address all the distinctive undertaking dangers, for the most part the budgetary dangers of the task.
Since the executive of the association needs a recommendation of a task approach that will decrease the money related dangers for the association, this is unquestionably an administration level movement. Alongside the undertaking supervisor that organization executive will likewise be engaged with this choice (Crawford, 2014). A task administration strategy is should have been proposed for the association that will get to the dangers related with the activities.
The recommended technique for association B is unquestionably PRINCE 2 venture administration strategy as it is thought to be the most extensive approach for administration of the dangers. In this venture administration approach, the task is actualized in a controlled domain with appropriate checking of the hazard and along these lines it diminishes the odds of dangers related with an undertaking. Keeping in mind the end goal to moderate the money related dangers related with the venture, it is fundamental to build up an appropriate administration body. It is conceivable with the assistance of PRINCE venture strategy (Newton, 2016). Since the budgetary hazard is related with every one of the undertakings attempted by the association, it is prescribed that the pRINCE2 technique is to be executed completely. In PRINCE2, the dangers related with a venture or an association is principally gotten to by the probability of event and its effect in the task. PRINCE2 is a procedure based approach that gives a simple and custom-made adaptation of task usage (Golini, Kalchschmidt & Landoni, 2015). This system is created by the workplace of government trade in UK and is widely utilized both in UK and universally. The execution design of this strategy is talked about underneath
The whole task is isolated into seven procedures that aides in less demanding observing of the undertaking, in this manner decreasing the dangers related with the same.
Appropriate Management of Projects
The controlling period of the venture sets up appropriate task administration with the goal that the dangers in the undertaking can be legitimately alleviated.
The PRINCE2 venture procedure guarantees that normal gatherings are held with the goal that the issues in the distinctive task process and the undertaking dangers can be examined legitimately.
While proposing the PRINCE2 venture procedure for the association B, certain suppositions are made. It is accepted that the workers know about the PRINCE2 venture strategy. On the off chance that the representative have no related knowledge of working with PRINCE2 venture administration strategy, it is accepted that legitimate preparing will be given to the representatives of the association (Machado, Pinheiro & Tamanini, 2015).
It is accepted that the PRINCE2 venture procedure will be proper for the sort of foundation extends that association B embraces. Since the PRINCE2 venture approach checks the suitability of an undertaking before proceeding onward to the following stage, it turns out to be anything but difficult to distinguish and moderate the dangers related with a specific task (Singh & Lano, 2014).
In any case, there are sure issues related with the utilization of PRINCE2 venture administration technique that the association may confront. The hidden issues related with this venture administration system essentially emerge due to the protracted undertaking stages. The change administration in the undertaking is troublesome if the task is utilizing a prince2 venture administration approach (Ramazani & Jergeas, 2015). The ventures that are executed with the PRINCE2 venture administration approach requires additional time for finish as it includes overwhelming documentation.
PRINCE2 venture technique is prescribed as it can offer various favourable circumstances and advantages to the association separated from appropriate hazard administration. It is an arrangement situated and process based approach and in this way, appropriate administration can be upheld in a venture. Moreover, the PRINCE2 venture strategy centres in legitimate advancement of the items and subsequently, utilization of this strategy can help in appropriate execution of the distinctive tasks attempted by association B (Lientz & Rea, 2016). Since the principle point of association B is to address and deal with the money related dangers related with the association, it is suggestion of PRINCE2 method for managing the projects for association B is supported.
Association C is an entrenched and develop association that was set up 11 years back. This association has fruitful plan of action and is hoping to enhance its undertaking conveyance capacities. This association gives budgetary administrations and advices in the zones of tax assessment, arranging, finance administration and retirement arranging. The senior administration of the association is continually searching for a group that is vigorous, excited and exceptionally energetic. The association is certain that their business procedure will accomplish great outcomes. In any case, the association is searching for a specific undertaking administration approach that will enhance the execution of the venture.
Project Management Methodologies
The decision of a venture administration strategy for this association is an administration level action in light of the fact that the higher authorities of the association is searching for a procedure that will enhance the execution of the activities that are attempted by this association. Every one of the branches of association that are accountable for the diverse undertakings that are being embraced ought to be engaged with choosing which system will be fitting for considering in this association (Seymour & Hussein, 2014).
Since the primary point of the association is to enhance the procedure of venture execution, six sigma venture strategy is proposed. This task approach will be actualized in the whole undertaking. The Six Sigma method for managing the projects was initially created by the Motorola Company as this organization needed their item to be totally of unique determination all through the plan and conveyance stage (Seymour & Hussein, 2014). Six Sigma is fundamentally a quality control approach that spotlights on get-together information for enhancing the task forms. This task approach is fundamentally utilized by the organizations keeping in mind the end goal to expand the proficiency, raise efficiency and convey the finished results to the purchasers (Tenera & Luís Carneiro, 2014). The usage design of Six Sigma comprise of 5 stages or procedures, which are as per the following:
At to start with, the requirements of the clients are characterized by recognizing the understanding that can be utilized to serve the clients. In the following stage, the execution of each task forms is estimated by making fitting measurements for the same. In this progression, the chiefs of the association can without much of a stretch decide how well a task addresses the issues of the clients. The subsequent stage is to dissect the necessities of the clients and the regular issues related with the undertaking so it can be enhanced (Golini & Landoni, 2014). The last advance is to synergize the outcomes so the administrators of the organization realize what changes in the task activity in required.
While recommending the Six Sigma venture procedure for Organization C, it is accepted that the chiefs of the association have a legitimate learning of six sigma venture strategy. It is additionally accepted that there are no dynamic dangers in the undertakings related with association C (Martinsuo & Killen, 2014). Notwithstanding, there are various issues related with the usage of the ventures in association C utilizing six sigma approach is that there is a total absence of initiative duty and in this way, shameful execution of the strategy can come about is sure undertaking dangers also. Moreover, the execution of Six sigma approach is a tedious undertaking. These difficulties can be alleviated by completing an exhaustive research about the procedure and giving appropriate preparing to the workers for better comprehension of this specific undertaking strategy (Teller, Kock & Gemünden, 2014).
Methodologies for Managing Different Types of Projects
The focal points or advantages of utilizing six sigma venture approach is that it helps in enhancing the business procedure and aides in better client relationship administration. The deformities in the undertakings are significantly diminished with the assistance of sig sigma venture administration system (Akmeemana & Wickramasinghe, 2016). Since the matter of association C is settled and it needs a procedure that will enhance the nature of the undertaking work, the suggestion of six sigma venture strategy is legitimized.
Conclusion
The reason for this paper is to propose diverse task systems that will be suitable for the associations A, B and C. Decision of an appropriate task procedure is fundamental keeping in mind the end goal to effectively convey and execute an undertaking. It is either the obligation of the venture director or the higher authorities of the administration to pick a specific task usage approach. The decision of a task procedure be that as it may, relies upon the necessities of a venture. The association A expected to execute an innovative and minimal effort venture and in this way, PMBOK is recommended. The Organization B expected to moderate the money related dangers related with the association and in this way PRINCE2 venture approach is proposed. The association C expected to enhance its activities and hence Six Sigma venture approach is proposed.
References
Akmeemana, A. P., & Wickramasinghe, C. N. (2016). Impact of Modern Project Management Methodologies and Software Development Life Cycle Models on Software Quality Assurance Success.
Bakel, L. A., Bernard, A., Melendez, J., Shawkat, J., Stowe, A. S., & Bajaj, L. (2018). The Application of Quality Improvement Methodologies to the Transformation of a Clinical Care Guideline (ccg) Program: Standardizing Standardization.
Berssaneti, F. T., & Carvalho, M. M. (2015). Identification of variables that impact project success in Brazilian companies. International Journal of Project Management, 33(3), 638-649.
Crawford, J. K. (2014). Project management maturity model. CRC Press.
Dybå, T., Dingsøyr, T., & Moe, N. B. (2014). Agile project management. In Software project management in a changing world (pp. 277-300). Springer, Berlin, Heidelberg.
Galván-Cruz, S., Mora, M., O’Connor, R., Acosta-Escalante, F., & Alvarez, F. (2015). On project management process in agile systems development methodologies and the ISO/IEC 29110 standard (entry profile).
Golini, R., & Landoni, P. (2014). International development projects by non-governmental organizations: an evaluation of the need for specific project management and appraisal tools. Impact Assessment and Project Appraisal, 32(2), 121-135.
Golini, R., Kalchschmidt, M., & Landoni, P. (2015). Adoption of project management practices: The impact on international development projects of non-governmental organizations. International Journal of Project Management, 33(3), 650-663.
Gollenia, L. A. (2016). Business transformation management methodology. Routledge.
Joslin, R., & Müller, R. (2016). The impact of project methodologies on project success in different project environments. International Journal of Managing Projects in Business, 9(2), 364-388.
Kerzner, H. (2015). Project management 2.0: leveraging tools, distributed collaboration, and metrics for project success. John Wiley & Sons.
Lientz, B., & Rea, K. (2016). Breakthrough technology project management. Routledge.
Machado, T. C. S., Pinheiro, P. R., & Tamanini, I. (2015). Project management aided by verbal decision analysis approaches: a case study for the selection of the best SCRUM practices. International Transactions in Operational Research, 22(2), 287-312.
Martens, M. L., & Carvalho, M. M. (2016). The challenge of introducing sustainability into project management function: multiple-case studies. Journal of Cleaner Production, 117, 29-40.
Martinsuo, M., & Killen, C. P. (2014). Value management in project portfolios: Identifying and assessing strategic value. Project Management Journal, 45(5), 56-70.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking project management performance and project success. International journal of project management, 32(2), 202-217.
Newton, R. (2016). Project management step by step: how to plan and manage a highly successful project. Pearson UK.
Ramazani, J., & Jergeas, G. (2015). Project managers and the journey from good to great: The benefits of investment in project management training and education. International Journal of Project Management, 33(1), 41-52.
Seymour, T., & Hussein, S. (2014). The history of project management. International Journal of Management & Information Systems (Online), 18(4), 233.
Singh, R., & Lano, K. (2014). Literature Survey of previous research work in Models and Methodologies in Project Management. Editorial Preface, 5(9).
Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(2), 278-290.
Teller, J., Kock, A., & Gemünden, H. G. (2014). Risk management in project portfolios is more than managing project risks: A contingency perspective on risk management. Project Management Journal, 45(4), 67-80.
Tenera, A. M. B. R., & Luís Carneiro, P. (2014). A Lean Six Sigma (LSS) project management improvement model. SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 912-920.
Vijayasarathy, L. R., & Butler, C. W. (2016). Choice of software development methodologies: Do organizational, project, and team characteristics matter?. IEEE Software, 33(5), 86-94.