Task Description
Accurate Decision Making is explained in details in relation to AS 4120-1994 and it is available in section 3 page.5
The tender is illustrated as per project for constructing the 50 storey building
Comprehensive Project Definition is explained in details in relation to AS 4120-1994 and it is available in section 6.1.1 page.6
The project report demonstrates all the process associated with building construction project. Responsibility has been given to Lendlease to perform all the activities related to construction of 50 storey building. It will take about a year to complete the construction project. The stakeholders associated with the 50 storey building construction project will work ethically as well as efficiently to complete the project successfully. The estimated budget of the project is around $800,000.
The Project Comprehensive Documentation interconnected with Tender is explained in details in relation to AS 4120-1994 and it is available in section 6.1.2
The tender Comprehensive Document contains the below data-
- The construction project’s working details have been explained throughout
- The appropriate conditions needed for the tender
- The timeline for the project is being illustrated
Appropriate Project Features Selection interconnected with tenders is explained in details in relation to AS 4120-1994 and it is available in section 6.1.3 page.7
Lendlease will have to carry out the project activities. The expert labourers will be assigned by the project manager to perform the building construction activities.
Comprehensive Tenders Calling is explained in details in relation to AS 4120-1994 and it is available in section 6.2.2 page.7
For the building construction project, the activities that are mandatory to perform have been listed in the project documentation. Along with the project details, tender related information is documented. All the necessary details of the customers like the name of the customers, email address of the customers have been presented well in the tender.
Comprehensive Inquiries interconnected with tenders is explained in details in relation to AS 4120-1994 and it is available in section 6.2.4 page.8
Comprehensive Inquiries interconnected with tenders is available on [email protected]
Comprehensive Project Features undergoing changes and reported in tender Comprehensive Documents is explained in details in relation to AS 4120-1994 and it is available in section 6.2.5 page.8
Tenders receipt is explained in details in relation to AS 4120-1994 and it is available in section 6.3 page.9
Comprehensive Closing of Tenders is explained in details in relation to AS 4120-1994 and it is available in section 6.5 page.9
Comprehensive Examination of Tenders is explained in details in relation to AS 4120-1994 and it is available in section 3 page.5
Tender Definition
Project Related Negotiation and selection is explained in details in relation to AS 4120-1994 and it is available in section 6.6 page.10
Belief is explained in details in relation to AS 4120-1994 and it is available in 7.1 page.10
Comprehensive Project Documentation Return with respect to Tender is explained in details in relation to AS 4120-1994 and it is available in section 7.2 page.10
Comprehensive Project Documentation control with respect to Tender is explained in details in relation to AS 4120-1994 and it is available in section 7.3 page.10
Local citizens who live nearby the construction site get the job opportunity
The building construction site area is based in
The building construction project requires the following resources- cement, sand and other resources
Lendlease is being given the responsibility to perform the activities related to building construction project. They will perform all the necessary activities related to construction of 50 storey building.
Comprehensive Submission of Tender is explained in details in relation to AS 4120-1994 and it is available in section 7.5 page.11
Confidentiality is explained in details in relation to AS 4120-1994 and it is available in section 8 page.11
The recent market scenario is thoroughly examined by the business analyst as well as the project manager and the detailed project schedule and the project budget is scheduled. The project budget is estimated around $800,000.
Simultaneously cash outflow and cash inflow for the building construction project is analysed by the project manager. A brief overview of the overall income of the project can be gained by this project. Payback period method is one of the way by which the net income can be predicted for the project.
The Project Related Contract Detailed Overview is explained in details in relation to AS 4000-1997 and it is available in clause 2 page.5
The Project Related Notices interconnected Service is explained in details in relation to AS 4000-1997 and it is available in clause 7 page.9
The Project Related Subcontracting is composed cohere to the AS 4000-1997 and it has been detailed in the clause 9 page.10
The Project Related Tender Requirements interconnected with statutory is explained in details in relation to AS 4000-1997 and it is available in clause 11 page.12
The Project Related Interconnected Assessing and Testing is explained in details in relation to AS 4000-1997 and it is available in clause 30 page.24
The Project Related Project Works Progress is explained in details in relation to AS 4000-1997 and it is available in clause 34.1 page.27
Project Justification and Financing
The Project Related Project Works Programming is explained in details in relation to AS 4000-1997 and it is available in clause 32 page.25
Project Operations Suspended is explained in details in relation to AS 4000-1997 and it is available in clause 33 page.26
The Project Related Budget Interconnected with Disruption is explained in details in relation to AS 4000-1997 and it is available in clause 34 page.27
The Project Related Liability Defects is explained in details in relation to AS 4000-1997 and it is available in clause 35 page.29
The Project Related Variations is explained in details in relation to AS 4000-1997 and it is available in clause 36 page.29
The Project Related Certificates is explained in details in relation to AS 4000-1997 and it is available in clause 37.2 page.31
The Project Related Payments is explained in details in relation to AS 4000-1997 and it is available in clause 37 page.30
The Project Related Insolvency is explained in details in relation to AS 4000-1997 and it is available in clause 39 page.33
The Project Related Termination is explained in details in relation to AS 4000-1997 and it is available in clause 40 page.37
The Project Related Claims is explained in details in relation to AS 4000-1997 and it is available in clause 41 page.37
The Project Related Dispute Resolution is explained in details in relation to AS 4000-1997 and it is available in clause 42 page.38
The Project Related Arbitration is explained in details in relation to AS 4000-1997 and it is available in section 42.3 page.39
The Project Quality Interconnected with users is explained in details in relation to AS ISO 10014-2007 and it is available in section 5.1 page.3
Assists in Project Related Leadership Quality is explained in details in relation to AS ISO 10014-2007 and it is available in section 5.2 page.5
The Project Related Stakeholders involvement is explained in details in relation to AS ISO 10014-2007 and it is available in section 5.3 page.6
Take up the Project Related approach is explained in details in relation to AS ISO 10014-2007 and it is available in section 5.4 page.7
Taking up of Methodological approach by project manager is explained in details in relation to AS ISO 10014-2007 and it is available in section 5.5 page.8
Change Improvement related to project is explained in details in relation to AS ISO 10014-2007 and it is available in section 5.6 page.9
Project Conditions and Processes
The Project Related Shared benefit is explained in details in relation to AS ISO 10014-2007 and it is available in section 5.8 page.11
The Project Related Safety management Detailed Review is explained in details in relation to AS/NZS 4804-2001 and it is available in section 4.5.2 page.39
The Project Related Safety measurement as well as evaluation is explained in details in relation to AS/NZS 4804-2001 and it is available in section 4.4 page.35
The Project Related Safety features Implementation is explained in details in relation to AS/NZS 4804-2001 and it is available in section 4.3 page.15
The Project Related Planning Safety is explained in details in relation to AS/NZS 4804-2001 and it is available in section 4.2page.11
The Project Related OHS policy of Project is explained in details in relation to AS/NZS 4804-2001 and it is available in section 4.2page.11
References
Abanda, F. H., Vidalakis, C., Oti, A. H., & Tah, J. H. (2015). A critical analysis of Building Information Modelling systems used in construction projects. Advances in Engineering Software, 90, 183-201.
Ebrahim, M. A. B., Mosly, I., & Abed-Elhafez, I. Y. (2016). Building construction information system using GIS. Arabian Journal for Science and Engineering, 41(10), 3827-3840.
Hwang, B. G., Shan, M., Phua, H., & Chi, S. (2017). An exploratory analysis of risks in green residential building construction projects: The case of Singapore. Sustainability, 9(7), 1116.
Kerosuo, H., Miettinen, R., Paavola, S., Mäki, T., & Korpela, J. (2015). Challenges of the expansive use of Building Information Modeling (BIM) in construction projects. Production, 25(2), 289-297.
Miettinen, R., & Paavola, S. (2018). Reconceptualizing object construction: The dynamics of building information modelling in construction design. Information Systems Journal, 28(3), 516-531.
Muhwezi, L., Acai, J., & Otim, G. (2014). An assessment of the factors causing delays on building construction projects in Uganda. International Journal of Construction Engineering and Management, 3(1), 13-23.
Ryu, H., Son, K., & Kim, J. M. (2016). Loss prediction model for building construction projects using insurance claim payout. Journal of Asian Architecture and Building Engineering, 15(3), 441-446.
Wang, X., Truijens, M., Hou, L., Wang, Y., & Zhou, Y. (2014). Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry. Automation in Construction, 40, 96-105.
Wong, S. S., & Lau, L. K. (2015). Advantages and setbacks of industrialized building system (IBS) implementation: a case study in Sarawak. International Journal of Sustainable Construction Engineering and Technology, 6(1), 52-61.
Yap, J. B. H., Abdul-Rahman, H., & Wang, C. (2016). A conceptual framework for managing design changes in building construction. In MATEC Web of Conferences (Vol. 66, p. 00021). EDP Sciences.
Zhao, N., Kam, C., TY Lo, J., Kim, J. I., & Fischer, M. (2018). Construction Parts in Building Projects: Definition and Case Study. Journal of Management in Engineering, 34(4), 04018014.