Energy Crisis and Pakistan

There has been an enormous increase in the demand of energy in Pakistan as a result of industrial development and population growth, as compared to increase in energy production. The number of energy consumers has increased to 12.5 million: household 46 per cent, industry 28 per cent, agriculture 12 per cent, bulk supply nine per cent and commercial five per cent. For faster economic growth, Pakistan need more generation. Supply of energy is, therefore, far less than actual demand, resultantly crisis has emerged. An energy crisis can be defined as any great bottleneck (or price rise) in the supply of energy resources to an economy.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Pakistan’s energy infrastructure is not well developed, rather it is considered to be underdeveloped and poorly managed. Rapid demand growth, transmission losses due to out-dated infrastructure, power theft, and seasonal reductions in the availability of hydropower have worsened the situation. Consequently, the demand exceeds supply and hence load shedding is a common phenomenon in all cities. Energy crisis in Pakistan started in 2007 and in 2008 it took a serious turn.

During 2009-10, energy supply and per capita availability of energy witnessed a decline of 0.64 per cent and 3.09 per cent respectively in comparison to previous year.

Pakistan needs around 15,000 to 20,000 MW electricity per day, however, currently it is producing about 11,500 MW per day hence there is a shortfall of about 4000 to 9000 MW per day. The power companies, circular debt is a big issue which has risen to 230 billion. Line losses, mainly theft, lone contributed Rs.125 billion to circular debt. It is better for the government to focus on curtailing power theft.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Mere power tariff raise could not revive the power sector, as numerous hikes in the past have not resolved the chronic problems of circular debt and power theft.

Pakistan’s energy consumption is met by mix of gas, oil, electricity, coal and LPG sources with different level of shares. Share of gas consumptions stood at 43.7 per cent, followed by oil 29.0 per cent, electricity 15.3 per cent, coal 10.4 per cent and LPG 1.5 per cent. Guddu plant is largest thermal operated plant with a capacity of 1,650 MW, while two largest Independent Power Plants (IPPs) are: Kot Addu (1,600 MW) and Hubb river (1,300 MW).

In 1994 during the Benazir’s government the IPs projects were bitterly opposed, blaming the government of taking commissions in these projects. However, no one had any idea how to solve the electricity problems. The situation went complicated when the civil-military bureaucracy didn’t allow Nawaz government to export surplus power to India because trading with the enemy on the basis of Most Favoured Nation (MFN) status was not acceptable to them. Now the circumstances have changed and we are ready to import electricity from India by granting them the same MFN status.

Hydro power is generated by using electricity generators to extract energy from moving water. Pakistan is having rich resources of energy in hydel power; however, only 34 per cent of total electricity generation is coming from this power. Currently we are having 6555 MW against the potential of 41000 t0 45000 MW. Current hydropower stations are: Tarbella Dam: 3,478 MW; Ghazi Barotha: 1,450 MW; Mangla 1,000 MW; Warsak 240 MW and Chashma 184 MW. Potential hydropower stations are: Diamer-Basha Dam 4,500 Mw; Munda Dam-Swat River in Mohmand Agency 740 MW; Kalabagh Dam 2400-3600 MW; Bunji Dam 5400MW and Dasu Dam 3800 MW.

Alternative sources of energy: Wind power harnesses the power of the wind to propel the blades of wind turbines. These turbines cause the rotation of magnets, which create electricity. Though Pakistan has potentials of wind energy ranging from 10000 Mw to 50000 Mw, yet power generation through wind is at the initial stages and currently 06 Mw has been installed in first phase in Jhimpir through a Turkish company and 50 MW will be installed shortly. More wind power plants will be built in Jhimpir, Gharo, Keti Bandar and Bin Qasim Karachi.

Solar power involves using solar cells to convert sunlight into electricity, using sunlight hitting solar thermal panels to convert sunlight to heat water or air. Pakistan has the potential of more than 100,000 Mw from solar energy. Building of solar power plants is underway in Azad Kashmir, Punjab, Sindh and Baluchistan. However, private vendors are importing panels/solar water heaters for consumption in the market. Alternative energy Development Board (AEDB) is working for 20,000 solar water heaters in Gilgit Baltistan. Mobile companies have been asked by the government is shift supply of energy to their transmission towers from petroleum to solar energy panels.

Biomass production involves using garbage or other renewable resources such as sugarcane, corn or other vegetation to generate electricity. When garbage decomposes, methane is produced and captured in pipes and later burned to produce electricity. Vegetation and wood can be burned directly to generate energy, like fossil fuels, or processed to form alcohols. Brazil has one of the largest renewable energy programmes from biomass/biodiesel in the world, followed by the US. Alternative Energy Development Board (AEDB) of Pakistan has planned to generate 10MW of electricity from municipal waste in Karachi followed by similar projects in 20 other cities.

Nuclear power stations use nuclear fission reaction to generate energy by the reaction of uranium inside a nuclear reactor. Pakistan has a small nuclear power programme, with 425 MW capacity, but there are plans to increase this capacity substantially. Since Pakistan is outside the Nuclear Non-Proliferation Treaty (NPT), it is excluded from trade in nuclear plant or material which hinders its development of civil nuclear energy. Remaining issue in development of nuclear energy are enrichment of uranium from U235 to U238, controlling chain reaction and dumping of solid waste.

Pakistan has had wider potentials to tap energy, however, due to lack of any integrated/proactive planning, very less number of power producing plant were installed to meet demand. Resultantly, over the years, the gap between energy demand and supply drastically grew and now against demand of 20000 Mw, we are having around 115000 MW.

Energy mix in Pakistan is quite imbalance in comparison to other countries, with greater reliance on non-renewable resources of gas (43.7 per cent) and oil (29 per cent majority of which is imported). Prices of petroleum products/crude oil fluctuate and in current Afro-Arab political crisis, the oil prices are likely to increase manifold affecting oil prices in Pakistan.

A rational energy mix planning ought to be developed giving greater dependency to renewable (hydel power), indigenous (coal) and alternative energy resources (wind and solar energy).

Coal: Pakistan is having one of the largest coal fields in Thar, having reserves of more than 175 billion tonnes, which exceeds equivalent oil reserves of Saudi Arabia, Iran, etc. In addition to power generation, this coal can be used for chemical and fertilizer production. Moreover, employment provided to workforce can be instrumental in increasing GDP and economic prosperity to many families. This is a positive sign that our renowned scientist, Dr, Samar Mubarakmand, has been working on the project to produce electricity from coal.

Pakistan has potential of hydro resources to generate 41000 to 45000 MW; however, only 6555 MW is currently being generated by this important renewable resource. Four large hydropower dams namely Kalabagh 3600 MW, Bhasha 4500 Mw, Bunji 5400 and Dasu 3800 MW can be constructed to generate . Similarly, many small to medium hydro plants can be installed on rivers and canals, etc.

Energy is pivotal for running all other resources and crisis of energy directly influences all other sectors of the economy. The economic progress is hampered by decline in agricultural productivity as well as by halting in operations of industries. One important factor of lower GDP and inflation of commodity prices in recent years is attributed to shortfalls in energy supply.

Social issue: this factor is primarily related to the domestic usage of energy (cooking, heating, and water provision). Load shedding cause unrest and frustration amongst the people and results in agitation against the government.

Decline in economic growth, lower agricultural productivity, unemployment and shackling industrial growth result in increasing poverty. Currently, around 40 per cent of our population is living below the poverty line and this ratio is increasing day by day. Ample control of energy crisis will surely yield in curbing this menace.

Conclusion: energy crisis has, more or less, plagued all sectors ranging from economy to industry, agriculture to social life, inflation to poverty and it is hampering national progress in a drastic manner. Nonetheless, the menace of energy crisis can be controlled by the government through making effective policies and its proactive implementation. Simultaneously, it is the responsibility of all Pakistanis, to utilise the available energy astutely and play our due role in the progress of our country. Following measures will be helpful in fighting the menace of energy crisis.

Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 15% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
How it works
Receive a 100% original paper that will pass Turnitin from a top essay writing service
step 1
Upload your instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
Pro service tips
How to get the most out of your experience with Course Scholars
One writer throughout the entire course
If you like the writer, you can hire them again. Just copy & paste their ID on the order form ("Preferred Writer's ID" field). This way, your vocabulary will be uniform, and the writer will be aware of your needs.
The same paper from different writers
You can order essay or any other work from two different writers to choose the best one or give another version to a friend. This can be done through the add-on "Same paper from another writer."
Copy of sources used by the writer
Our college essay writers work with ScienceDirect and other databases. They can send you articles or materials used in PDF or through screenshots. Just tick the "Copy of sources" field on the order form.
Testimonials
See why 20k+ students have chosen us as their sole writing assistance provider
Check out the latest reviews and opinions submitted by real customers worldwide and make an informed decision.
Psychology
I requested a revision and it was returned in less than 24 hours. Great job!
Customer 452467, November 15th, 2020
Accounting
Thank you for your help. I made a few minor adjustments to the paper but overall it was good.
Customer 452591, November 11th, 2021
Finance
Thank you very much!! I should definitely pass my class now. I appreciate you!!
Customer 452591, June 18th, 2022
Education
Thank you so much, Reaserch writer. you are so helpfull. I appreciate all the hard works. See you.
Customer 452701, February 12th, 2023
Political science
Thank you!
Customer 452701, February 12th, 2023
Psychology
Thank you. I will forward critique once I receive it.
Customer 452467, July 25th, 2020
Business Studies
Great paper thanks!
Customer 452543, January 23rd, 2023
Technology
Thank you for your work
Customer 452551, October 22nd, 2021
Political science
I like the way it is organized, summarizes the main point, and compare the two articles. Thank you!
Customer 452701, February 12th, 2023
11,595
Customer reviews in total
96%
Current satisfaction rate
3 pages
Average paper length
37%
Customers referred by a friend
OUR GIFT TO YOU
15% OFF your first order
Use a coupon FIRST15 and enjoy expert help with any task at the most affordable price.
Claim my 15% OFF Order in Chat

Order your essay today and save 15% with the discount code GINGER