The project of Airport Terminal Construction Project has been developed for considering the alignment of the work and forming the successful work development. The effective and smart management of the works would be eased with the inclusion of the activities. The construction of the ground and first floor development had been implied with the continuation works. The following assignment has been done for taking part in the integration and the analysis of the works. The management of the operations of the constructions would be effectively implied with the management of the improved functional analysis. The assignment had considered the implication of the construction works and the completion of the activities aligning with the smart project completion management.
The project schedule has been considered for the management of the activity listing and formation of the effective operation development. The implication would be managed with the utilization of the factors and development of the smart management processing. The project schedule has been shown below,
The new completion date of the project with the required modification is Tue 10/27/20 (472 days).
Conclusion
The assignment had realized that the implication of the smart work development would be implied cohesively with the management of the successive and smart management formation. The integration of project management tools had been implied with the management of the successful and effective implication tools. The management had been helpful for implying the information management development. The integration had been implied with the smart and management. The assignment had implied the listing of the factors and development of the successful management activities.