Importance of ethics in construction industry
1. It has been said that the cause of ethical failure in an organisation can often be traced to its organisational culture and the failure on the part of the leadership to actively promote ethical practices.
Discuss why it is important for a Construction company to have a Code of Ethics?
According to a survey, the construction industry is among the most fraudulent industries in the world (Transparency International, 2005), with 48 % of construction professionals believing that abuse of power is commonplace inside that industry (CIOB,) and 41 % having been individually provided inducements at least once throughout their careers. Ethical codes alone are inadequate to guarantee transparency by professionals; these codes should be enforced through job instruction and the appointment of personnel including an ethics officer to supervise ethical issues in the workplace.
Integrating ethics into functions is a top priority in any industry, including the construction industry. Even before planning to work on multi-million dollar projects, it is critical to maintain excellent relationships with partners, developers, and subcontractors. If some of these parties engage in corrupt issues or construction techniques, it can endanger both of the employees and future residents’ lives. The construction sector continues to generate a lot of money, making it a convenient target for Dishonest Or Unethical Behaviour. Some are tempted to break corners or engage in environmental misbehaviour in order to shorten a project’s timeline and increase cash flow.
Leaders must uphold the highest moral standards not only for their teams, but also for themselves. Employees of all levels of experience ought to be free to stare to executive leadership for guidance on how to portray the Corporation And Conduct Business
It is possible to learn how to make ethical decisions. This is essential in building a firm that value doing the right thing. Specific processes can be put in place by construction firms to mitigate any problems that may arise. Construction companies need to provide pathways of feedback when training a team. This includes keeping an open door, conducting reviews, internal audits, and providing situational advice to your team members to help them make sound decisions.
Regardless of how well user start preparing to manage ethical issues, situations will arise that must be managed. When a person in the team approaches one with such a consideration, it is critical that individuals behave on that and have a strictly delineated plan of action in place when a report is received. Interviews with parties and written statements are examples of this. Although a situation may necessitate the use of outside legal counsel, it is preferable to related professional internally. This could include a reprimand, a corrective action plan, or termination. Ethical behaviour should be rewarded in the same way. This will serve as an incentive for the squad to keep up the great work.
2. The NEC form of contract has been designed to be simple and flexible, designed around a concept of a common purpose. The NEC sets out to achieve this by ‘Stimulus of good Project Management’.
Maintaining excellent relationships with partners and subcontractors
Discuss how the three key NEC principles within ‘Stimulus of good Project Management’ are achieved in creating a simple and flexible environment for Civil Engineering projects.
NEC is contract families that aid in the implementation of good task management principles and practises, as well as the definition of legal relationships. NEC’s vision is to be the worldwide key to promoting industry standards in the procurement of works, services, and supplies.
Following are the 3 fundamental principles of NEC contract forms in which they are designed-
- Clarity
- Flexibility
- Stimulus to good management.
These three fundamental components are explained further below:
Because NEC contracts are easily readable than most standard forms, they:
- Are written in easy-to-understand English
- Use of little technical terms
- Are laid in a highly coordinated, orderly, and modular manner.
- Are devoid of all references to special regulations.
Furthermore, each individual of the NEC family shares a common structure, concepts, and language. The concept of clarity is further applied in NEC provide the specific roles for those involved, as well as clear processes outlining precisely what those people must do and then within what time frames.
The NEC family of companies can provide a deal for any project, service, or supply:
- In any industry
- With any degree of difficulty
- As part of any procurement strategy
- With varying levels of risk redistribution among contract parties
- With various payment options
NEC is intended to be used as a list of project management processes, and when used correctly, it surely encourages good management. It does, however, require the succeeding key elements when compared to other standard forms:
- Collaborative mind-set
- Accepted Program
- Timelines
- Risk Management
- Change Pre-Assessment
3. Leadership and Management are often interlinked with some people confusing the two concepts.
(a) Explain the difference between Leadership and Management in terms of construction site management.
(b) Assess the leadership skills required by construction managers during the management of a construction project.
(a) the Distinction in both Leadership and Management
It is conceivable to be both a leader and a manager. However, because being a strong leader will not really imply they’ll be a good manager, or vice versa (Norman et al., 2018).
Visionaries are regarded as leaders. They chart the course for the organization’s expansion. They are constantly assessing where their organization is, in which those who get to go, as well as how they can get there through involving the team (Kahunyo et al., 2019)
A leader inquires about what or why, while a manager inquires about how and when. To do equality to their responsibilities as a ruler, one may doubt and assert the control to avert decisions that are not in the greatest advantage of the team (Hoàng et al., 2019).
(b)Key elements which will assists in becoming a stronger leader in construction management
Motivate Employees with Vision one Have in Mind
The team looks to whether an individual wants to establish the strategic vision as well as overview the basic duties and priorities of the teams one works with from the start (Nima et al., 2021). Keeping the vision in the forefront and clears how well the vision will empower the entire people to reach its goal will help align the group around a common mission. The group can start trusting and reliant to view them through to accomplishment of the vision if one communicates it clearly and confidently (Flores-Hernández et al.,2022).
Make sure that the team has the help and services they must do one‘s best work (Nasir et al., 2018). Encourage the members to achieve, analyze, and end up making decisions in which they can resolve issues and advance projects so that one’s team can continue operating as effectively and successfully as possible. While this may appear to be a risk at first, with proper guidance and oversight, your team will be able to continually make these kinds of decisions with progressively better results each time (Rios et al., 2021). Enabling ones team by delegating specific tasks to other members of the team and demonstrating self – confidence to complete the task would then tried and trusted, respect, and boost one‘s own real motive to contribute. Inspire everyone else to take on that role whenever possible (Pfeiffer et al., 2021). If users genuinely think their teammates are able to produce, you give us the opportunity to collaborate more autonomously, allowing more time to perform on higher-priority items (El Zein et al.,2021).
Learning to make ethical decisions
Work to take cognizance of the project you’re working on, as well as how each team’s objectives contribute to the project’s successful completion (Pfeiffer et al., 2020). Great leaders admit when they don’t know something or start seeking to fill information gap in order to perform better in whatever they do (Stretton et al., 2018). Striving to help ones knowledge of the trade’s teams users collaborate with this by asking questions of your teammates or learning how to be an improved program manager a do are great ways to improve one’s understanding of business and command the respect of one’s teammates(Doeh et al.,2019).
Project managers are expected to project schedule regardless of what happens (Saravanakumar et al., 2020). This entails making difficult decisions and being an expert problem solver when unexpected problems arise (Saadat et al., 2020). A critical feature of strong leaders in the construction sector is ones way to evaluate an issue, comprehend its potential to be beneficial, and operate independently to mitigate it. Knowing when to ask your team for help or when to find it out on one’s own is critical to making impactful decisions, and will end up serving also as initiatives are becoming more difficult and complex to solve(Dalcher et al., 2018).
4. The Project Management Body of Knowledge (PMBOK) is a collection of processes and knowledge areas accepted as best practice for the project management profession. There are 10 knowledge areas which are typical within almost all construction projects.
Analyse 5 of the 10 knowledge areas, detailing the processes which should accomplish proven project management functions and drive project success.
Followings are the 5 knowledge areas-
During the initiation phase, this project management involves basic plans such as developing a project charter. This is the document that formalises the project and names a project manager (Žigien? et al., 2019).
The project plan, which is formed as a contribution to guarantee the project’s success, is another component of this region. Stakeholders and/or funders create the construction project, which is then supervised and recorded as the work proceeds via a change log (Colaço et al., 2019).
The project’s scope is involved with the project’s task. As a consequence, plan scope management has been incorporated into the project plan. It is also at this point that a comprehensive requirement for such final output is compiled. Confirmation scope all throughout assignment that also essentially guarantees that responsibilities are approved by the source of funding or stakeholder on a regular basis. The preceding occurs even during the formation of teams and is worried with having to accept work packages instead of the specifications established through planning (Cai et al.,2022).
As one might expect, project management plans are time consuming. The project is divided into tasks, within each start date, deadline, and budget. Even though things constantly change during a project, these records must be updated on a regular schedule. The above requirements are then categorised as finishing-to-beginning, finishing-to-finishing, beginning-to-beginning, or beginning-to-finishing. This is usually reserved for larger projects (Yeager et al., 2021).
Managing ethical issues in construction industry
This includes developing a project spending plan, as well as acquiring good estimate equipment to improve that the financial affairs cover the scope of the project and are supervised on a regularly to keep involved people or sponsors informed (Nakafeero et al., 2018).
The process for constructing the budget, as well as how or if it will change, and also what mechanisms must be used to regulate it, would then be determined by strategy cost management. Every task must be casted, including all assets such as physical work, tools, and anything else necessary to finish the task (Kuya et al., 2022).
A task can be done on schedule and within budget, but if the achievement is subpar, it is considered a failure. Strategic planning quality management is part of the overall project plan, but can also be used as a hold record if it includes the performance standards for the good or service (Linkoaho et al., 2020).
Processes designed to carry out good project management features and push project success.
Each common factor for successful improvement projects is the capacity of the project manager to start negotiations and effectively managing the intricate nature of the project’s numerous affected stakeholders. Stakeholders have a significant, if not the most significant, impact on projects (Khumput et al., 2020). As a result, managing stakeholder and sponsor relationships is a critical factor in ensuring project success, which includes accepting and implementing team recommendations. “Relationship” is the key word. This entails more than just identifying and “managing” stakeholders. A connection is an emotional bond between two people (Kaur et al.,2021). To have effective improvement initiatives, project management must know this emotional connection and, as a result, focus on developing their possess interpersonal skill set. The project manager should ensure that the all stakeholders not only are distinguished, but also evaluated in a direction that relations and financial support can be developed primarily. Project managers must ensure that decision makers are on panel with the outlook that are used to manage people, the reliability equipment and the use of data to aid decisions, as well as the testing protocols the project coordinator will use to confirm recommendations. Or else, sponsors or even other stakeholders may continue to question the methods and approaches used to manage the business (Katuwal et al., 2021).
Plans of any kind would quickly become problematic. Problems are unavoidable when dealing with multiple stakeholders involved, teammates, expertise, and departments. Process improvement (PI) initiatives, by definition, are prone to complications. A PI projects are typically put together because current results are inadequate (Kahunyo et al.,2019). Because processes almost always traverse departments within an institution, PI projects are typically made up of inter team members. It’s not unusual for any of these divisions, or silos, to have contrary views and objectives, or to simply dislike one another. This is where things start to go wrong (Burrow et al., 2019). Every project has its own set of challenges, conflicts, and issues.
The goal of a program management project is to improve results. However, continuing to improve results is not always simple. A project manager requires a tried-and-true methodology to guide him or her through the transition from actual standings to improved performance. The Six Sigma DMAIC measures can help with just about any improvement project in this situation. DMAIC is an acronym that remains for Define, Measure, Analyse, Improve, and Control. Because there are only five basic steps, they are simple to remember, understand, and apply. If used correctly, this tried-and-true methodology could indeed improve any process (Ben et al., 2021).
Fundamental principles of NEC contracts
Anyone who has ever worked on a proposal in which the project leader was not an effective counsellor can attest to the value of project facilitation. It makes a lot of difference in the world to have a supervisor who is also an excellent facilitator. Teams collaborate. People are engaged. Everything is going swimmingly. The majority of construction supervisors are natural leaders who excel at planning. However, this does not imply that they have been necessarily good facilitators (Al-Sardary et al., 2021).
References
Al-Sardary, S.Y.T., Mustafa, H.A., 2021. Consequences of new approach in production system of commercial layer (Isa Brown) in Iraqi Kurdistan region, in: IOP Conference Series: Earth and Environmental Science. IOP Publishing, p. 012103.
Ben, S., Reuben, N., 2021. Strategy implementation practices and performance of commercial banks in kenya: the case of guaranty trust bank kenya limited. International Journal of Social Sciences Management and Entrepreneurship (IJSSME) 4.
Burrow, J.D., 2019. [PP270-minor] Foliar Fungal Disease Management For Commercial Citrus Groves. EDIS 2019.
Cai, Y.-J., Choi, T.-M., Zhang, T., 2022. Commercial used apparel collection operations in retail supply chains. European Journal of Operational Research 298, 169–181.
Colaço, A.F., Molin, J.P., Rosell-Polo, J.R., 2019. Spatial variability in commercial orange groves. Part 2: relating canopy geometry to soil attributes and historical yield. Precision Agriculture 20, 805–822.
Dalcher, D., 2018. Commercial Management and Projects: A Long Overdue Match?, in: Managing Projects in a World of People, Strategy and Change. Routledge, pp. 163–167.
Doeh, D., 2019. Awards of Costs in International Commercial Arbitration: A Simple Guide to the Principles. Series 2 Vol. 1 Amicus Curiae 260.
El Zein, M.A.T., 2021. Examining the Relationship between the Use of Managerial Discretion in Level 3 Fair Value and Earnings Management in Lbanese Commercial Banks.
Flores-Hernández, E.R., García-Alonso, C.R., Hervás-Martínez, C., 2022. Strategic management practices in Central American micro family enterprises: The case of the commercial sector in El Salvador. Managerial and Decision Economics.
Hoàng, T.H., 2019. Measures To Improve Liquidity Management In Vietnam’s Commercial Banks. Journal of Economic Development 20–27.
Kahunyo, M.N., Waithaka, P., 2019. Change Management Practices and Performance: A Case of Commercial Banks in Nyeri County, Kenya. International Journal of Current Aspects 3, 101–123.
Katuwal, D., 2021. Impact of Pesticides in Commercial Bee Farming: A Review. Research & Reviews: Journal of Veterinary Science and Technology. 2021; 10 (1): 8–14p. Impact of Pesticides in Commercial Bee Farming: A Review Dharmaraj Katuwal STM Journals 2.
Kaur, T., Solomon, P., 2021. A study on automated property management in commercial real estate: a case of India. Property Management.
Khumput, S., Thiengtham, J., 2020. Behavior, egg production, and bone strength of commercial laying hens at various cage densities and different cage types. Songklanakarin Journal of Science & Technology 42.
Kuya, R.M., Oindo, B.O., Long’ora, A.E., 2022. Influence of Levels of Awareness, Willingness to Pay, and Incentives on Solid Waste Management Practices by Commercial Enterprises in Kakamega Town. European Journal of Environment and Earth Sciences 3, 7–13.
Linkoaho, O., 2020. Commercial Management of Projects.
Nakafeero, R., 2018. Assessing record management system at Commercial Courts Buganda road (PhD Thesis). Makerere University.
Nasir, S.N.C.M., Aziz, S., 2018. Performance of Building Maintenance in Operation & Management at Commercial Building. International Journal 1, 76–89.
Nima, A., 2021. Energy Consumption Management of Commercial Buildings by Optimizing the Angle of Solar Panels. Journal of Renewable Energy and Environment 9.
Norman, D.J., Ali, G.S., 2018. Pothos (Epipremnum aureum) Diseases: Identification and Control in Commercial Greenhouse Production: PP340, 7/2018. EDIS 2018.
Pfeiffer, D.G., Johnson, C.S., Bergh, C.J., Derr, J.F., 2021. 2021 Horticultural and Forest PMG-Commercial Small Fruit: Diseases and Insects.
Pfeiffer, D.G., Johnson, C.S., Yoder, K.S., Bergh, J.C., 2020. Commercial Small Fruits: Disease and Insects. p. 2-1–2-23. In: 2020 Pest Management Guide for Horticultural and Forest Crops. Va. Coop. Ext. Pub. 456-017.
Rios, M., 2021. Commercial Sardine Fishing in Mexico: A Financial Perspective Working towards the well-being of the industry, ecosystem, and community.
Saadat, D., Pinero, J.C., n.d. Evaluation of a Grower-Friendly Attract-and-Kill Strategy for Apple Maggot Fly, Rhagoletis Pomonella, Control in Commercial Apple Orchards.
Saravanakumar, D., 2020. A guide to good agricultural practices for commercial production of ginger under field conditions in Jamaica.
Stretton, A., 2018. A commentary on “commercial management” in the program/project context1.
Yeager, T., 2021. Commercial nursery guide. General Technical Report (1 of 23 volumes) 260, 1–47.
Žigien?, G., Rybakovas, E., Alzbutas, R., 2019. Artificial intelligence based commercial risk management framework for smes. Sustainability 11, 4501.