Selecting a suitable residential property as the subject of the report
The building selected is a residential detached house located at the junction of the Whithouse Ln and the Whitehouse Cl. This is an old house with various internal and external defects.
The residential property is a 1 storey building having a ground floor and first floor. The ground floor comprises of an entrance hall, and other rooms such as bedrooms, study rooms, and the living room. The ground floor also has the kitchen and dining area, plus a utility room. The first floor comprise of two other bedrooms and a family bathroom.
The outside area of the building has two garages and an underfloor heating. Other utilities within the building area include a boiler and plumbing system. The general outlook of the building is in an American black walnut and doors and windows that are refitted double glazed.
Named as Cornwall cottage, the residential property is in the Wooburn Green village outskirts around the M40 Junction.
- About the inspection
Date of inspection: XXXX |
Weather conditions at the time of the inspection: XXXX |
The status of the property when inspected: |
The building was inspected at the outside without any opening or forcing up to the fabric. Other areas that were subject to inspect are but not limited to utilities such as electricity, gas, heating systems, water and drainage services. These are elements that are visible, and they were not tested.
In order to have a full description of the home, The condition ratings of the building were given to some of the primary elements of the building including the garages and some of the outside parts of the building.
The element boxes used were parts E, F, G and H. Those elements with the worst condition rating are described first, and the conditions of the parts were briefly outlined.
Below is a full description of the condition rating:
Condition ratings
Condition ratings have been given to the main parts (elements) of the building. Some elements are made up of several parts. In sections E and F and the student will describe the part that has the worst condition rating first and then briefly outline the condition of the other parts.
The condition ratings are described as follows.
3 |
Defects that are serious and / or need to be repaired, replaced or investigated urgently |
2 |
Defects that need repairing or replacing but that are not considered to be either serious or urgent. The property must be maintained in the normal way |
1 |
No repair is currently needed. The property must be maintained in the normal way. |
NI |
Not inspected (see important notes below) |
Important note:
This is a visual inspection. Students will not take up carpets, floor coverings or floorboards, move furniture or remove the contents of cupboards. They will not remove secured panels or undo electrical fittings.
Students will inspect roofs, chimneys and other surfaces on the outside of the building from ground level and, if necessary, from neighboring public property with the help of binoculars.
Arranging and conducting an inspection of the property
Inspection of the inside of the roof space will be from the access hatch if safe to do so.Floor surfaces will be inspected subject to the above limitations.Cellars will be inspected if accessible but not under-floor voids.
Students will note in their report if they are unable to check any parts that the inspection would normally cover and say if they have reasons to suggest further investigation is necessary.
The student will not report on the cost of any work to put right defects or make recommendations on how repairs should be carried out. (This is a level 1 Report)
- Summary of the condition ratings
Here students will summarise the condition ratings they have determined for different elements of the property. If the element is made up of different parts (as may be the case with several separate roofs for example) then ONLY the part in the WORST condition is shown here.
It is therefore important that all sections of the report are read for a full impression.
Condition rating 3
Section of the report |
Element No |
Element Name |
e.g. E3 |
e.g. Rainwater pipes and gutters |
|
Insert rows if necessary |
||
Condition rating 2
Section of the report |
Element No |
Element Name |
e.g. E Outside the property |
e.g. E1 |
e.g. Chimney stacks |
Insert rows if necessary |
||
Condition rating 1
Section of the report |
Element No |
Element Name |
e.g. E Outside the property |
e.g. E5 |
e.g. Windows |
Insert rows if necessary |
||
- About the property
Type of property |
Detached chalet propert |
Approximate year built |
Incl. some ref to evidence relied on |
Approximate date of extension / alteration |
XXXX |
Accommodation
Floor |
Living rooms |
Bedrooms |
Bath or shower |
Separate toilet |
Kitchen |
Utility room |
Conservatory |
Other |
Ground floor |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
First Floor |
0 |
1 |
2 |
1 |
0 |
0 |
0 |
0 |
Construction
Here the student will summarise the construction technique and materials used.
The student is not expected to have seen the Energy Performance Certificate
Mains services
The student has determined that the following services are present (indicate Y or N).
Gas |
Y |
Electricity |
Y |
Water |
Y |
Drainage |
Y |
Central Heating
Gas |
Y |
Electric |
Y |
Solid fuel |
Y |
Oil |
Y |
Other energy sources (including feed-in tariffs)
Not included in this student survey |
Outside the property
Limitations to inspection: |
Note: cross reference risks to J3
Element number |
Description of the parts and condition |
Condition rating |
E1 |
Chimney stacks: In each case complete a main description and then identify specific areas separately if necessary (e.g. where there is more than one part) |
|
E2 |
Roof coverings: |
|
E3 |
Rainwater pipes and gutters: |
|
E4 |
Main walls: |
|
E5 |
Windows |
|
E6 |
Outside doors: |
|
E7 |
Conservatory and porches |
|
E8 |
Other joinery and finishes: |
|
E 9 |
Other: |
ITEM: |
DESCRIPTION: |
CONDITION: |
||
EXTERIOR |
||||
Tiled Rear Garage Roof |
Fully covered with clay |
Front pitch tiles have been intermittently |
||
plain type tiles. |
replaced throughout. |
|||
Slipped tile to the junction of the right ridge |
||||
four courses up. |
||||
Ridge tiles are clay type and are |
||||
intermittently weathered throughout. |
||||
Flank Face of the Garage |
Plain clay tiles. |
Moss growth throughout though generally |
||
Nearest to the Adjoining |
in a fair and reasonable condition. |
|||
Owner’s Property |
||||
Roof of the Garage |
Mineral felt. |
Felt is slightly balding to the rear ridge |
||
500mm from the junction of the |
||||
conservatory roof. |
||||
Roof gutter along the flank of the building at |
||||
the junction of the building owner’s |
||||
property is blocked showing heavy signs of |
||||
detritus and silt build-up. |
||||
Gutter along the flank of the conservatory |
||||
roof light signs of detritus build-up but |
||||
there are no signs of any blockage. |
||||
Roof along the Flank of |
Plain clay tiles. |
All tiles are intact. |
||
the Rear Garage |
||||
Gutters are showing light signs of detritus |
||||
build-up. |
||||
Flank Wall of the |
Rendered and painted. |
Rendering is unlevel throughout although |
||
Adjoining Owner’s House |
Part pebble dash render |
no signs of any significant cracking, crazing |
||
painted. |
or defects. |
|||
Front Elevation of the |
Brickwork solid |
In a fair and reasonable condition. |
||
Garage |
construction. |
|||
Ground to the front of |
Laid concrete. |
Level throughout. |
||
the Garage |
||||
Fence at the junction of |
Fencing nearest to the garage is showing |
|||
the building owner’s |
signs of damage. |
|||
property |
ITEM: DESCRIPTION: CONDITION:
Two front panels nearest the street are also showing signs of damage. Fence is intermittently weathered throughout.
Front Elevation Party Fence Wall
Front Wall/Retaining Wall with Pavement
Brickwork, solid construction, London stock.
Brickwork cavity construction.
Brickwork, solid construction part cavity construction.
Appears to be in a fair and reasonable condition with no signs of any spalling brickwork.
In a fair and reasonable condition.
Light staining of the brickwork throughout.
Staining of the brickwork throughout, although appears to be in a fair and reasonable condition.
Stairs Leading down to the |
Fully covered with |
Lower Ground Floor |
concrete paving. |
Courtyard |
All paving is intact and stairs are level throughout.
Ground to the Lower Ground Floor Courtyard
Windows to the Front Lower Ground Floor Level
Fully covered with concrete paving.
UPVC double-glazed.
Intermittent cracked/minor cracked slabs.
All glazing is intact.
Door |
UPVC-framed, double- |
All glazing is intact. |
glazed. |
||
Windows at Ground Floor |
UPVC-framed, double- |
All glazing is intact. |
Level |
glazed. |
|
Windows at First Floor |
UPVC-framed, double- |
All glazing is intact. |
Level |
glazed. |
|
Windows at Second Floor |
UPVC-framed, double- |
All glazing is intact. |
Level |
glazed. |
Stairs Leading up to the Ground Floor Entrance
Fully covered with ceramic All tiles are intact.
type tiles.
Windows to Top Floor
Roofing to the Patio Area
Rear Wall of the Ground Floor Section
UPVC-framed, double-glazed.
Concrete-framed, fully covered with paint.
Brickwork, London stock, solid construction.
Deciding on external or internal elements for reporting
All glazing is intact.
Paint is intermittently peeling to the underside of the patio throughout.
Brickwork is in a fair and reasonable condition.
ITEM: |
DESCRIPTION: |
CONDITION: |
|||||
Brickwork to the House |
London stock, solid |
Brickwork is in a fair and reasonable |
|||||
construction. |
condition. |
||||||
Roof to the Rear |
Timber panelling, painted. |
Paint |
is |
intermittently |
weathered |
||
throughout. |
|||||||
Ground |
Part laid concrete, part |
Concrete in a fair and reasonable condition. |
|||||
concrete paving. |
|||||||
Paving is scratched, although all paving |
|||||||
appears to be intact. |
|||||||
Fence |
Timber type. |
Weathered. |
|||||
Firm when tested. |
|||||||
Ceiling |
Plastered and painted. |
Hairline open board joints originating at the |
|||||
junction of the bedroom partition, |
|||||||
intermittent throughout. |
|||||||
Party Wall |
Plastered and painted. |
Aside from minor scuffing appears to be in |
|||||
a fair and reasonable condition. |
|||||||
Hairline separation crack at the junction of |
|||||||
the ceiling running side-to-side throughout. |
|||||||
Bedroom Partition |
Plastered and painted. |
Hairline separation cracks at the junction of |
|||||
the surrounding walls. |
|||||||
Hairline crazing to the front face of the |
|||||||
pier, intermittent throughout. |
|||||||
Rear Wall |
Plastered and painted. |
Where visible, in a fair and reasonable |
|||||
Partially obscured by a |
condition. |
||||||
freestanding wardrobe. |
|||||||
Floor |
Fully covered with a |
Slightly creaked underfoot. |
|||||
laminate board. |
|||||||
Windows to the Rear |
UPVC double-glazed. |
All glazing is intact. |
|||||
Bedroom to the Rear |
|||||||
Ceiling |
Plastered and painted. |
Open board joint, hairline in width, |
|||||
originating at the centre of the party wall, |
|||||||
extending away from the party wall, |
|||||||
meeting the storage cupboard over the |
|||||||
entire distance. |
|||||||
ITEM: |
DESCRIPTION: |
CONDITION: |
||
Rear Windows |
UPVC double-glazed. |
All glazing is intact. |
||
Explanation (Outside) Please select two elements where you can explain how the condition rating was arrived at including the citing of any sources that have helped you in understanding the process or assessing the construction and defect(s) where apparent.
Element 1
A comprehensive description of the element or component being rated (with citations)
An explanation how the condition rating (CR) was decided follows using the recommended RICS protocol (add citation)
Stage One
Is the building element in a satisfactory condition? No
Stage Two
- Does the defect impair the intended function of the element?
Yes
- Has the defect caused structural failure or serious defects in other building elements?
Yes
- Has the problem compromised the structural integrity of the element?
Yes
- Does the defect seriously and directly threaten the safety of the building users?
Yes
- Are urgent repairs or replacements needed now or can it be left until the next anticipated period of regular maintenance?
Yes
- Does the problem require further investigation?
Yes
Element 2
A comprehensive description of the element or component being rated (with citations)
An explanation how the condition rating (CR) was decided follows using the recommended RICS protocol (with citations)
Stage One
Is the building element in a satisfactory condition? Yes / No
If ‘No’ then proceed with the following:
Stage Two
- Does the defect impair the intended function of the element?
Yes
Has the defect caused structural failure or serious defects in other building elements?
Yes
Has the problem compromised the structural integrity of the element?
Yes
Does the defect seriously and directly threaten the safety of the building users?
- Are urgent repairs or replacements needed now or can it be left until the next anticipated period of regular maintenance?
Yes
Does the problem require further investigation?
Yes
- Inside the property Optional – not done.
Limitations to inspection: |
Note: cross reference risks to J3
Element number |
Description of the parts and condition |
Condition rating |
F1 |
Roof structure: |
|
F2 |
Ceilings: |
|
F3 |
Walls and partitions: |
|
F4 |
Floor: |
|
F5 |
Fireplaces, chimney breast and flues |
|
F6 |
Built in fittings (kitchen etc, not appliances): |
|
F7 |
Woodwork (staircase, joinery etc) |
|
F8 |
Bathroom fittings: |
|
F 9 |
Other: |
Explanation (Inside)Please select two elements where you can explain how the condition rating was arrived at including the citing of any sources that have helped you in understanding the process or assessing the construction and defect(s) where apparent.
Element 1
E.g.: F2, Ceilings
A comprehensive description of the element or component being rated (with citations)
Your text here
An explanation how the condition rating (CR) was decided follows using the recommended RICS protocol (add citation)
Stage One
Is the building element in a satisfactory condition? Yes / No
Your text here:
Stage Two
- Does the defect impair the intended function of the element?
Yes / No
Your text here
- Has the defect caused structural failure or serious defects in other building elements?
Yes / No
Your text here
- Has the problem compromised the structural integrity of the element?
Yes / No
Your text here
- Does the defect seriously and directly threaten the safety of the building users?
Yes / No
Your text here:
- Are urgent repairs or replacements needed now or can it be left until the next anticipated period of regular maintenance?
Yes / No
Your text here
- Does the problem require further investigation?
Yes / No
Your text here
Element 2
E.g.: F2, Ceilings
A comprehensive description of the element or component being rated (with citations)
Your text here
An explanation how the condition rating (CR) was decided follows using the recommended RICS protocol (with citations)
Stage One
Is the building element in a satisfactory condition? Yes / No
Your text here:
If ‘Yes’ then Condition Rating One applies – supply reasoning (see below)
If ‘No’ then proceed with the following:
Stage Two
- Does the defect impair the intended function of the element?
Yes / No
Your text here
- Has the defect caused structural failure or serious defects in other building elements?
Yes / No
Your text here
- Has the problem compromised the structural integrity of the element?
Yes / No
Your text here
- Does the defect seriously and directly threaten the safety of the building users?
Yes / No
Your text here:
- Are urgent repairs or replacements needed now or can it be left until the next anticipated period of regular maintenance?
Yes / No
Your text here
- Does the problem require further investigation?
Yes / No
Your text here
- Services (Not required)
Grounds(Not required)
Students are not inspecting the groundsStudents are not reporting on legal issues
- Risks
Students will summarise defects and issues that present a risk to the building or grounds, or a safety risk to people. These may have been reported and condition rated against more than part of the property or be of a more general nature having existed for some time and which cannot be reasonably changed.
See note below regarding J1
J1 |
Structural movement Dampness Timber defects Students can acknowledge existence of these defects but are not expected to comment in detail as this area of the syllabus has not yet been reached, |
J2 |
Risks to grounds Students are not inspecting grounds |
J3 |
Risks to people Cross ref to previous comments, if any |
J4 |
Other |
References
Mill, T., Alt, A. and Liias, R., 2013. Combined 3D building surveying techniques–terrestrial laser scanning (TLS) and total station surveying for BIM data management purposes. Journal of Civil Engineering and Management, 19(sup1), pp.S23-S32.
Douglas, J., 2010. Building surveys and reports. John Wiley & Sons.
Smeaton, A.C., 1883. The Builder’s Pocket Companion: Containing the Elements of Building, Surveying, and Architecture. With Practical Rules and Instructions Connected with the Subject. HC Baird & Company.
Smeaton, A.C., 1837. The Builder’s Pocket Manual: Containing the Elements of Building, Surveying and Architecture. With Practical Rules and Instructions in Carpentry, Bricklaying, Masonry, &c. Observations on the Properties of Materials and a Variety of Useful Tables and Receipts. M. Taylor.
Michael, C.Y.L., 1998. Building Facades: A guide to common defects in tropical climates. World Scientific.
Hinks, J. and Cook, G., 2002. The technology of building defects. Routledge.
Mann, R.S., 2006. Defect-Free Buildings (McGraw-Hill Construction Series): A Construction Manual for Quality Control and Conflict Resolution. McGraw Hill Professional.