1. Develop an early-start and a late-start schedule for the project in Exercise 9.6 using a Grant chart.
and
2. Identify the critical path, and calculate the slack of noncritical activities.
[The assignment should be at least 400 words minimum and in APA format (including Times New Roman with font size 12 and double spaced)