Unified Process (UP)
Unified process (UP) method can be easily defined as a proper kind of iterative method which is used as incremental management development process. It mainly relates to the fact that every project is cut in small phases where a new kind of new kind of incremental version is mainly delivered at the end of each phase. This particular approach is based or depended on UML modelling description of software architecture. The user case development mainly focuses on the various requirements of users and along with its demands.
XP method is also known as Extreme Programming can be easily defined as a proper set of practices. This practices are mainly used for application development in given optimal condition which can be easily obtained by placing of customer in the given development process. This model also aims in maintaining a close relationship with various customers. Extreme programming is totally based on various concepts like
- Development of team work directly with the given customers in short span or cycle that is of one or week interval on maximum.
- Properly delivery of version of various software’s which has occur at early stage and at rapid interval which is mainly used for maximization of impact.
- It tends to have tight collaboration with the various development team when it is working properly on the given code.
- The given code needs to be tested and cleaned up by the help of development process.
- Various indicators tend to measure the progress of given project which is mainly used for development of plan.
RAD that is Rapid Application Development model is totally based or depended on prototype and iterative kind of development which involves specific planning. It is must focused on proper gathering of requirements of customer by the help of workshop or groups. It mainly aims in testing of prototype by customer by making use of iterative concept. This model mainly focuses on reuse of existing prototypes, continuous integration and delivery at rapid. There are large number of RAD model like
Business Modelling: Business model for the given product which is under development phase is all about flow of information and distribution of proper information between various kinds of available channel.
Data Modelling: Various kinds of information can be used in business modelling phase which is properly reviewed and analysed for forming sets of data which objects for the given business.
Process Modelling: Various kinds of information can be gathered in the different phase of business modelling. It is mainly used for analysing various form of sets of object which is considered to be important for any business.
Application Generation: Actual kind of system has been built and after that coding is done properly by the help of automation tools. It can be used for converting process and data models into given type of actual prototype.
Scrum is considered as one of the most popular method or framework which is used for implementation of agile. With the help of scrum product can be easily built for fixing length iteration known as sprint. It provides a proper kind of framework for shipping software on regular cadence. Scrum aims in providing four kinds of structure to each of the point like:
Extreme Programming (XP)
Sprint planning: A team planning is considered to be meeting the various factors which is completing in the coming sprint.
Daily stand-up: It is also known as a daily scrum which is used for 15 minutes for various team for proper synchronization.
A scrum team is considered to be slightly different from traditional model of waterfall. It comes with specific roles that is product owner, scrum master and lastly development team. The product owners are considered to be champions in their markets. Products are more focused in understanding in three domains like products owner, scrum master and development team. Product owners are generally considered to the champion of the given product. It is much focused on proper understanding the business and requirements of market. Scrum master are considered to be champion for scrum for the given team. The product owners team and business processes which mainly aims in looking for the ways for fine tune of the large number of practices.
The proper kind of methodology needs to be selected as the provided organization is small. So it can be easily suggested to make use or implement waterfall model which is considered to be an important factor for increasing the size.
Australian Fashion Design is one of the best brands in the heart of Brisbane. The branches present in the Melbourne and Sydney sells the designer clothes that are traditional in nature to the retail unit. The sales representatives of Australian Fashion Design acts as the bridge between the processing if the organization and the retail shops that purchase the goods from the Australian Fashion Design. Australian Fashion Design also sells the wedding dresses using the wedding representatives as their main bridge between the Australian Fashion Design the clients. The retail unit of the business reaches and covers the distance between China and New Zealand with the help of the courier system. The fashion clothing ensures the fact that the designer clothes that are fancy in nature reach the likes of the China and New Zealand. The retailers that takes care of the processing of the goods from Australian Fashion Design to the retail shops present in China and New Zealand has their own retail shop of Australian Fashion Design in China and New Zealand. The major reason behind this kind of processing is too control the fact that the retailers must not get the opportunity to get access to any other brand for the p[purpose of the retailing brand endorsement.
Rapid Application Development (RAD)
The major issue with the processing of the Australian Fashion Designs is that interaction among the employees of the organization is not at the top most level due to the lack of advancement of the computing process. This process ensures that the communication among the employees is not at a very transparent level. This also ensures the fact that the employees are not always aware of the processing of the decision-making in the organization. This leads to the fact that the processing of the data through the hierarchy of the business module. This fact might lead to the potent cause of the dissatisfaction of the employees of the organization. This leads to the demeaning of the productivity of the organization. This process ensures the fact that the employees that do not have a proper enhancement with the organization deals with the processing of the detailing of the sales. Australian Fashion Designs does not keep any record of the sales that the organization makes due to the proceeding of the retailers who acts as the bridge between the Australian Fashion Design the clients. The retail unit of the business reaches and covers the distance between China and New Zealand with the help of the courier system. The fashion clothing ensures the fact that the designer clothes that are fancy in nature reach the likes of the China and New Zealand. The retailers that takes care of the processing of the goods from Australian Fashion Design to the retail shops present in China and New Zealand has their own retail shop of Australian Fashion Design in China and New Zealand. The enhancement of the Human Computer Interface introduction leads to the fact that the interaction and the communication between the employees of the organization increases. This fat effects positively the process of the installing the User-centered design helps in the processing of the details to the employees related intra to the organization. This process ensures the transparent coordination of the employees in the organization. The plan of setting of Human Computer interface with the help of the User-centered design will increase the efficiency f the processing of the organization. The owner of the organization Julia Spencer can get into touch with the employees of the organization leading to the fact that the interaction between the employee increases to a great amount. This also ensures the fact that the transparency of the hierarchy is maintained and the process is continued with the utmost efficiency. This leads to the fact that the connectivity of the employees of the organization increases to the greatest level and the processing is done with the highest efficiency. The Human Computer Interface will enable the higher authority of the organization to know the where about of the organization that is located in China and New Zealand. This will enable the processing to know about the diversified want of the clients and the reviews will be helpful in the long run for the Australian Fashion Design. This will ensure the fact that the betterment of the organization is processed and the functional efficiency is maintained.
Event |
Event Type |
Trigger |
Source |
Activity/Use Case |
System Response/Output |
Destination |
Filling up the application form |
External Event |
The detail of registration are entered in to the application form. |
customers |
application |
Accept the form submission |
system |
The application form is to be reviewed. |
Internal Event |
The admin views the form. |
Management |
Application review |
Provide the application for analysis |
Customers |
The details of the customer are to be recorded |
Internal Event |
The details of the customer are recorded in the system. |
Sales representative |
Record customer details |
Store the details of the customers |
Customers |
The ABN of the customer is to be recorded. |
Internal Event |
The ABN number of the customer id entered into the system. |
Sales representative |
Record ABN details |
Store the details of the customers |
Customers |
Online order placing |
The items are selected by the customers |
customers |
Order products online |
The items are placed into the account of the customers |
System |
|
Reviewing the order |
Internal Event |
The orders are placed by the customer. |
Management |
Review order |
The items are produced to the management for review |
System |
Order confirmation |
Internal Event |
The selection of the order confirmation option. |
system |
Confirm order |
The system stores the order of the customer |
Customer |
Checking the progress of the order. |
Internal Event |
After the order is placed. |
customer |
Track orders |
The system displays the progress of the order |
System |
Delivery Of the Order |
Internal Event |
After the product is completed. |
Delivery staff |
Deliver order |
The order delivery in stored in the system |
Customers |
Checking of the monthly sales report |
Internal Event |
Sales report is generated. |
system |
Check Monthly sales report |
The monthly sales report is displayed |
Management |
Running sales report |
Internal Event |
The sales report generation. |
Management |
Run sales report |
The sales report analysis is displayed |
System |
Maintenance of the record |
External Event |
Record maintenance |
Management |
Maintain record |
The record is stored in the system |
System |
Identification of the potential customers for the system. |
Internal Event |
The recording of customer actions. |
Management |
Identify potential customers |
The customers of the system are stored |
System |
Tracking the visits of the customers |
Internal Event |
The customer orders are tracked. |
Management |
Track the customer’s visits |
The details of the orders of the customers are displayed |
System |
Use Case Name: |
Record ABN |
|
Scenario: |
The system would be recording the ABN of the customer |
|
Triggering Event: |
The sales representative would be entering the details of the customer. |
|
Brief Description: |
The ABN number of customer is recorded in the system |
|
Actors: |
The sales representative, the customer |
|
Related Use Case: |
Not applicable |
|
Stakeholders: |
The customers |
|
Precondition: |
The details of the customers are to be stored in the system. |
|
Post Condition: |
The customer would be registered in the system. |
|
Flow of Activities: |
Actor |
System |
1. Enter customer details 2. Fetch the ABN |
1. Store details 2. Display ABN |
|
Exception Conditions: |
The ABN of the customer is absent. |
References
Alkhateeb, A., Nam, Y.H., Rahman, M.S., Zhang, J. and Heath, R.W., 2017. Initial beam association in millimeter wave cellular systems: Analysis and design insights. IEEE Transactions on Wireless Communications, 16(5), Economics.2807-2821.
Azar, A.T. and Vaidyanathan, S. eds., 2015. Chaos modeling and control systems design (Vol. 581). Germany: Springer.
Dennis, A., Wixom, B.H. and Tegarden, D., 2015. Systems analysis and design: An object-oriented approach with UML. John wiley & sons.
Dong, X., Shi, Z., Lu, G. and Zhong, Y., 2015. Formation?containment analysis and design for high?order linear time?invariant swarm systems. International Journal of Robust and Nonlinear Control, 25(17), pp.3439-3456.
McCuen, R.H., 2016. Hydrologic analysis and design (Vol. 3). Prentice Hall.
Montgomery, D.C., 2017. Design and analysis of experiments. John wiley & sons.
Rashid, M.H. ed., 2017. Power electronics handbook. Butterworth-Heinemann