Benefits of Using Prototype Development Methodology
Software development can be defined as the proper type of the prototype model which helps in focusing on the factor that the given project is executed before the given deadline. This specific methodology primarily involves the various measures which easily gets involved in various developments which builds up the prototype for the given base. Then the client processes are started. The flow of the processes mainly involves the different types of the prototypes design and the client evaluation along with the reviews. management, it can be said that a proper prototype development helps in the deter development of the project.
- The Various kind of the risks that can take place in the given project can easily be identified.
- Error can easily be handled with proper review and evaluations.
- It becomes lot easier for the clients to understand the project using the prototype of the project.
- The number of the waste generated that reduces the number of the resources available for the project.
- It has been seen that the various request from the clients distracts the developer from the actual goal of the project.
- If the client asks for changes in the later stage of the development then it becomes difficult for the developer to go back.
- The various generated prototypes increases the amount of the development time and the price of the project.
This method is one of the best for the projects of short interval of times, and is one of the most efficient one. The strategy which makes that this process one of the available methodology is because of the factor that it ensures high quality of work in a very short interval of time. The developers also gets very much interested at the complexity of the projects are very much less and hence there are lots of scope to develop the best outcome.
Some of the major benefits of using this methodology is efficiency, time, client feedback and the risks in the methodology can be easily reduced. In cases of any error the amount of the changes that are to be made very less due to small size of the project. The profit amount in this process is very high due to small size of the projects. There are many kinds of benefits which can be obtained like feedback of client which helps in proper maintenance of standard. One of the major drawback of this methodology is the factor that it cannot be used for large projects which has many requirements.
Description:
This development methodology is a part of agile methodology, which is mainly used of for the software development projects. The D.S.D.M. projects usually includes on RAD approach which mainly used for the different kinds of association provided by client side. The RAD approach is the business development of the project in a short interval of time. Apart from various objectives it also aims in giving programming models which is predefined in the given budget plan. The different kind of involvements from the user’s side in the given process is generally prominent in nature. The expensive nature of this process from both the user and the developer side leads to very small profit from this procedure.
DSMD Methodology for Software Development Projects
Description:
The joint application development methodology primarily focusses on the involvement of various users at a given interval of time for a given project. These workshops are commonly known to be the JAD sessions. It has more customer loyalty due to the factor that it is rated according to the client for given phase of the project. This methodology is primarily developed for the various kind of the frameworks related to the PCs. There are various kind of the users and the developers are connected in the same time and hence there are more scopes of discussion. The stakeholder expectation are much higher in this methodology. There are many of the drawbacks in this methodology and is also a very inefficient way of development.
For proper kind of methodology, it should be taken into account neglected organization is considered to be small one. It is suggested to implement waterfall model as it will help them in increasing the size. On the contrary for large size organization it is generally suggested that they should implement to make use of RAD technology to their given software development. This particular method or process is considered to be efficient and various kinds of development cost of the given cost of project is mainly considered to be easily bearable by the given organization taking account of the size of the given organization.
Re: Adopting a User Centered Design (UCD) approach and setting a plan for the development of the Human Computer Interaction (HCI)
There is various type of difficulties which are faced by the organization in the present time. This has brought about the need for the development of a user centered Design. Hence there is a proposal to develop a solution which is user centric and the developed system would be able to produce an efficient solution that would be perform functions that would be helping the organization in reducing the response time.
The system would bring about efficient solution and make the procedures of the organization automated. The system would also reduce the time required for management of the workload and increase the efficiency of the organization. The major procedures of the organizations are also handled by the system.
Event |
Event Type |
Trigger |
Source |
Activity/Use Case |
System Response/Output |
ABN Record |
Internal |
The system has enter the ABN number of the customer id |
Sales Representative |
ABN details Record |
Customer details are stored |
Filling of application form |
External |
Entry of customer details |
Customer |
Application Form |
Accepting the submission of form |
Application Review |
Internal |
the form being reviewed by the admin |
Management |
Application Review |
Analyzing the provided application |
Customer Details Record |
Internal |
Entry of customer details into the system |
Sales Representative |
Customer Details Record |
Customers Details are stored |
Select order |
External |
Customer make selection of order |
Customer |
Selection of Order |
Customer select the items |
Online Orders placing |
External |
Place the orders selected |
Customer |
Product Order Online |
Items Placed into the Customer’s account |
Review Order before Placing |
External |
Customer reviews the order |
Customer Review order |
Producing the items details to the customers |
|
Order Confirmation |
Internal |
Selecting the order to confirm |
System |
Confirm Order |
Customer order is stored in the system |
Review Order after Placing |
Internal |
Customer placed orders are reviewed |
Management |
Management Review order |
Producing the items details to the management |
Check Order Progress |
Internal |
tacking the progress of the order |
Customer |
Track Orders |
Order Progress being displayed by the system |
Order Delivery |
Internal |
Delivery of the product |
Delivery Staff |
Deliver Order |
System stored the delivery order |
Maintain the record |
External |
Maintaining the record of the report |
Management |
Maintain the Record |
System stored the record |
Identify Customer |
Internal |
Viewing the actions of the customer |
Management |
Identify Customer |
Stored the visit of the customers in the system |
Track visits of Customer |
Internal |
tracking of customers’ orders online |
Management |
Track Customer Visits |
Displayed the customer’s order details |
Check Sales Report Monthly |
Internal |
Generating of monthly sales report |
System |
Monthly Report of Sales are Checked |
Displayed monthly sales report |
Running the sales report |
Internal |
Analyzed the sales report |
Management |
Displayed the sales report analyzed |
Displayed the analysis of sales report |
Use Case Name: |
Application review |
|
Scenario |
The application would be reviewed by the management |
|
Triggering Event: |
The application would be submitted by the customer. |
|
Brief Description: |
The application is reviewed and it is decided if the application is accepted or not. |
|
Actors: |
The management, the customers |
|
Related Use Case: |
Not applicable |
|
Stakeholders: |
The customers |
|
Precondition: |
The details of the customer are entered in the application. |
|
Post Condition: |
The customer would be registered in the system. |
|
Flow of Activities: |
Actor |
System |
1. The customer would enter the application 2. The application of the customer is accepted/rejected. |
1. Send for review 2. Rejected or accepted |
|
Exception Conditions: |
The ABN of the customer is absent. |
References
Alkhateeb, A., Nam, Y.H., Rahman, M.S., Zhang, J. and Heath, R.W., 2017. Initial beam association in millimeter wave cellular systems: Analysis and design insights. IEEE Transactions on Wireless Communications, 16(5), pp.2807-2821.
Azar, A.T. and Vaidyanathan, S. eds., 2015. Chaos modeling and control systems design (Vol. 581). Germany: Accounting.
Dennis, A., Wixom, B.H. and Tegarden, D., 2015. Systems analysis and design: An object-oriented approach with UML. John wiley & sons.
Dong, X., Shi, Z., Lu, G. and Zhong, Y., 2015. Formation?containment analysis and design for high?order linear time?invariant swarm systems. International Journal of Robust and Nonlinear Control, 25(17), pp.3439-3456.
McCuen, R.H., 2016. Hydrologic analysis and design (Vol. 3). Prentice Hall.
Montgomery, D.C., 2017. Design and analysis of experiments. John wiley & sons.
Rashid, M.H. ed., 2017. Power electronics handbook. Butterworth-Heinemann.