In this course, you will progressively work on a system implementation process in six stages:
Week 1: System planning
Week 2: System analysis
Week 3: System selection
Week 4: System implementation
Week 5: User training and system maintenance
You can use Internet resources, peer-reviewed journals, and reputable, published articles, and you may interview an executive of a healthcare facility that has implemented an electronic medical record system/electronic health record system or similar system to describe the six implementation steps.
This week there are three tasks to do. First, you will work on the user training phase of the system implementation, considering the following:
Planning for training
Contents of training
Methods of training
Location of training
Schedule of training
Resources needed
Training the trainer
Conducting the training
Additional periodic ongoing trainings
Computer-assisted training
Complete the section in a 3–5-page.
Second, this week is final phase of the system implementation that results in the acceptance, rejection, or modification of the project, and release, suspension, or deduction of the contracted amount to the vendor(s)—system maintenance. Compose a brief (2-page) summary of how you will:
Ensure that all hardware work together.
Ensure that every function of every application of the computer system works and the system meets the functional requirements and the RFP specifications.
Ensure that data between different systems interfaces and is transferred smoothly and in correct format.
Ensure correct transference of data from old to new system (conversion testing).
Ensure that the system can work under maximum load (volume/stress testing).
Verify that the system works as expected in a live environment.
Third, combine your earlier Final Project papers into a single document, and place this summary at the end.
Cite any sources in the APA format.
HINTS:
Note there are three parts to this assignment and the assignment is worth 250 points so you want to maximize your points
Part 1: First, you will work on the user training phase of the system implementation, considering the following:
Planning for training
Contents of training
Methods of training
Location of training
Schedule of training
Resources needed
Training the trainer
Conducting the training
Additional periodic ongoing trainings
Computer-assisted training
Complete the section in a 3–5-page.
Your plan needs to be specific with examples- do not just list generalities. Think who, what, when, why and how with full sentences explaining each component.
Part 2: this week is final phase of the system implementation that results in the acceptance, rejection, or modification of the project, and release, suspension, or deduction of the contracted amount to the vendor(s)—system maintenance. Compose a brief (2-page) summary of how you will:
Ensure that all hardware work together. How will you do this?
Ensure that every function of every application of the computer system works and the system meets the functional requirements and the RFP specifications. How will you do this?
Ensure that data between different systems interfaces and is transferred smoothly and in correct format. How will you test this?
Ensure correct transference of data from old to new system (conversion testing).Include your specific plan with details.
Ensure that the system can work under maximum load (volume/stress testing). How will you test the system so on your busiest day, the systems do not crash.
Verify that the system works as expected in a live environment.
Part 3: Combine your earlier Final Project papers into a single document, and place this summary at the end.