Week 2 Group Project Outline
Individual Portion
Based on the Week 2 chat you need to have print screens and/or discuss in detail the following items
· Show how you take a computer and would join it to a domain
o name/workgroup change
· Show how to logon to the new domain
· show how to map network drives to the server
· show software you might install to get a user going on the new network
o antivirus
o adobe reader
o Malwarebytes or some spyware detection program
o Other company software
Group Portion
Document
· Visio (or other) diagram showing locations for wired connections throughout the office (Andrew)
· server install process (Andrew)
· changes to the existing server (mainly promoting it to a domain controller (Andrew)
· The IP addressing subnetting scheme and how it changed from phase 1 (Andrew)
· minimum of 8 screen shots (Andrew)
PowerPoint
· 6 – 10 PowerPoint slides
· IP addressing scheme and security (duplicate info from document above)
o think users
o think folder authorizations
· any changes to operating system
o for example a Windows 7 Home has difficulty joining a domain, so we would upgrade it to Windows 7 Professional
· Network services needed because of changes to the network
· what needs to be done to the existing facilities or systems to integrate old system with the new
· TCP/IP services to be considered
o DHCP
o DNS
· additional equipment required.