surveying and layout
1. Your supervisor has asked you to prepare a list of equipment that your crew will use for construction survey and layout for a building project.
a. List six of such equipment
b. Pick two from the list which are PPE and state their functions
2. Giving example, differentiate the field engineer from office engineer with reference to construction surveying and layout
3. I. What is effective communication and why is it important in construction survey and layout?
II. It is an important requirement for the field engineer to communicate effectively to the craftspeople during surveying work at the jobsite.
a. What are the three words to summarize the basic principles of marking in construction survey
b. Describe each of the three words with reference to surveying and layout
4. Using examples, differentiate the following with reference to survey and layout
a. Errors and mistakes
b. Accuracy and precision and stating where you would use require both
5. Describe the requirement for a sharp tool in surveying and layout operation